Every observation on an Electrical Installation Condition Report carries a code. Here is what each one means, which ones fail a report and what you need to do about them.

Reviewed 8 October 2026 · 6 minute read

The four EICR codes at a glance

An EICR records observations using four classification codes set out in the model forms of BS 7671. Any C1, C2 or FI makes the overall report unsatisfactory. C3 on its own does not.

CodeMeaningAction
C1Danger present — risk of injury nowImmediate
C2Potentially dangerousUrgent
FIFurther investigation required without delayUrgent
C3Improvement recommendedAdvisory

C1 — Danger present

C1 means someone could be injured by the installation as it stands today. The inspector should make the item safe before leaving site — usually by isolating the circuit or removing the damaged accessory — and tell the person responsible for the property straight away.

  • Exposed live conductors, for example a broken socket faceplate
  • Missing blanking plates leaving live busbars accessible in the consumer unit
  • Accessible live parts after DIY work or water damage
  • Reversed polarity that leaves a metal light fitting live

C2 — Potentially dangerous

C2 is not an immediate danger, but it would become one if a fault occurred or conditions changed. It is the most common reason a report fails, and it needs urgent remedial work.

  • No main protective bonding to incoming gas or water pipes
  • Earth fault loop impedance too high for the protective device to disconnect in time
  • Socket circuits likely to supply equipment outdoors without RCD protection
  • Signs of overheating at terminals or accessories
  • Combustible consumer unit in an escape route where this creates a fire risk

C3 — Improvement recommended

C3 means the installation does not meet the current edition of BS 7671 in some way, but it is not dangerous. A report with only C3 observations can still be satisfactory. Many owners deal with C3 items when other work is happening, such as replacing a consumer unit.

  • Missing warning notices or circuit charts
  • Older-style plastic consumer units in locations where they are not a hazard
  • Lighting circuits without RCD protection in some situations

FI — Further investigation required without delay

FI is used when the inspector has seen something that could be a C1 or C2 but cannot confirm it within the agreed extent of the inspection. A common example is a circuit that cannot be traced, or a test result that points to a hidden fault. Until the investigation is finished, treat an FI with the same urgency as a C2.

For private rented homes in England, the landlord must complete remedial work or further investigation for C1, C2 and FI observations within 28 days, or sooner if the report says so. Written confirmation must then go to the tenant and the local authority within 28 days of the work being completed. See our landlord EICR requirements guide.

Satisfactory or unsatisfactory?

The overall assessment on the front of the report is unsatisfactory if there is at least one C1, C2 or FI. Once the remedial work is done and tested, the electrician issues the paperwork for that work — usually a Minor Works Certificate or an Electrical Installation Certificate — and the combination shows the installation is now safe for continued use. Some landlords and agents also ask for a fresh satisfactory EICR.

Polarity explains every observation in plain English, gives each one a fixed remedial price and can usually carry out C1 and C2 fixes on the same visit. See remedial pricing or the EICR cost guide.

Frequently asked questions

Does a C3 fail an EICR?

No. C3 means improvement is recommended. A report with only C3 observations can still be satisfactory.

Does FI make an EICR unsatisfactory?

Yes. An FI means something may be dangerous and needs investigation without delay, so the report is recorded as unsatisfactory until it is resolved.

How quickly must a landlord fix C1 and C2 codes?

In the private rented sector in England, within 28 days of the inspection, or sooner if the report says so. C1 items should be made safe straight away.

Can the same electrician carry out the repairs?

Yes. Polarity prices each C1, C2 and FI observation on the report, and can often complete the work on the same visit, then issue the certification for that work.

Book an EICR in London & the South East